• Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch
    • Home
    • Company
      • About Us
      • Message from the Chairman
      • Board of Directors
      • Our Team
      • Career
    • Our Services
    • Our Projects
    • News and Events
    • Get in touch
  • mail@htr.com.np
  • (+977) 1 4430066
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunnelling and Research Pvt. Ltd
  • Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch

Portfolio Categories: Detailed Engineering Design

Budhi gandaki Hydroelectric Project (341MW)

  • April 1, 2026
Budhi Gandaki Hydroelectric Project (341MW) HTR, in joint venture with Hydro Consult, Multiconsult (Norway), and SSC, is carrying out the Detailed Engineering Design of a Peaking Run-of-River hydropower project...
Continue Reading

Dudhkoshi-2 Hydroelectric Project (93MW)

  • April 1, 2026
Dudhkoshi-2 Hydroelectric Project (93MW) HTR is carrying out Detailed Engineering Design of Peaking Run of River hydropower project of capacity 93MW located across Dudhkoshi river in Solukhumbu District. Major...
Continue Reading

Lapche Tamakoshi Hydroelectric Project (60.2MW)

  • March 31, 2026
LAPCHE TAMAKOSHI HYDROELECTRIC PROJECT (60.2MW) HTR is carrying out Detailed Engineering Design of Peaking Run of River hydropower project of capacity 60.2MW located across Lapche Khola in Dolkha District....
Continue Reading

Bakan Khola Hydropower Project (44MW)

  • March 30, 2026
Bakan Khola Hydropower Project (44MW) HTR is carrying out Detailed Engineering Design of Peaking Run of River hydropower project of capacity 44MW located across the Bakan Khola in Sankhuwasabha...
Continue Reading

Lungri Khola Hydropower Project (9.6MW)

  • March 30, 2026
Lungri Khola Hydropower Project (9.6MW) HTR is carrying out Detailed Engineering Design of Peaking Run of River hydropower project of capacity 9.6MW located across Rapti Khola in Rolpa District....
Continue Reading

Dudh Khola Hydroelectric project (65MW)

  • March 30, 2026
Dudh Khola Hydroelectric Project (65MW) HTR is carrying out Detailed Engineering Design of the headworks of the Run of River hydropower project of capacity 65MW located across the Dudhkhola...
Continue Reading

Midim-I Hydropower Project (13.42MW)

  • March 30, 2026
Midim-I Hydropower Project (13.42MW) HTR is carrying out Detailed Engineering Design of the Run of River hydropower project of capacity 13.42MW located across the Midim River in Lamjung District....
Continue Reading

Myagdi Khola Hydropower Project (65MW)

  • March 30, 2026
Myagdi Khola Hydropower Project (65MW) HTR is carrying out Detailed Engineering Design of the Run of River hydropower project of capacity 65MW located across Myagdi and Kunaban Khola in...
Continue Reading

Tiplyang Kaligandaki Hydropower Project (86MW)

  • March 11, 2025
Tiplyang Kaligandaki Hydropower Project Has completed Updated Feasiblity Study and is carriying out Detailed Engineering Design of Run of River cascade hydropower project of capacity 86MW located across the...
Continue Reading

Siwa Khola Hydropower Project (9.3MW)

  • March 11, 2025
Siwa Khola Hydropower Project Is carrying out Updated Feasibility Study and Detailed Engineering Design of Run of River hydropower project of capacity 9.3MW located across Siwa River in Taplejung...
Continue Reading

Posts pagination

1 2 Next
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunneling and research Pvt. Ltd is an engineering consultancy service company providing services mainly in Planning, Design and implementation of Hydropower and Tunnelling/Underground Projects.

Discover More

Contact Info

  • Kalikasthan, Kathmandu-29, Nepal
  • (+977) 1 4430066
  • hydrotunnelling@gmail.com
  • 09:00 am - 05:30 pm

News and Events

Hydro Tunnelling and Sagarmatha Hydropower Partner for Dudhkoshi-6 Hydropower Project Design April 3, 2026

Copyright © 2025, Hydro Tunnelling and Research Pvt. Ltd.
Powered by AspireWEB