LAPCHE TAMAKOSHI HYDROELECTRIC PROJECT (60.2MW)
HTR is carrying out Detailed Engineering Design of Peaking Run of River hydropower project of capacity 60.2MW located across Lapche Khola in Dolkha District.
Major features:
Design Discharge 21m3/sec, Gross head 330m, Plant Capacity 60.2MW

Project Details
- Category: Detailed Engineering Design
- Client: Dynamic Hydro Energy Pvt. Ltd.
- Location: Kathmandu, Nepal
- Project Status: DED Ongoing




