Myagdi Khola Hydropower Project (65MW)
HTR is carrying out Detailed Engineering Design of the Run of River hydropower project of capacity 65MW located across Myagdi and Kunaban Khola in Myagdi District.
Major features:
Design Discharge 12.50m3/sec, Gross head 629m, Plant Capacity 65MW
Myagdi Khola Hydropower Project (MKHPP) is conceived as a run-of-river type project. The project area is located in Bagara, Dhaulagiri Rural Municipality of Myagdi District, Gandaki Province, Nepal. The headworks are located upstream of the confluence of Myagdi and Kunaban Khola, one on each river that meets at Dovan. The powerhouse is proposed on the right bank of Myagdi Khola at Jeltun Village, about 7500 m downstream from the Myagdi-Kunaban confluence at Dhaulagiri Rural Municipality.

Project Details
- Category: Detailed Engineering Design
- Client: Hydro Village Private Limited
- Location: Kathmandu, Nepal
- Project Status: DED ongoing





