
Mr. Sanish Raj Lakhey
Education
- BE in Civil Engineering, Himalayan Whitehouse Int’l College, Purbanchal University (PU), Kathmandu, Nepal.
- M.Sc. in Hydropower Engineering(ongoing), Institute of Engineering, Tribhuvan University (TU), Nepal;
Experience
With over 7 years of experience in Hydropower sector. Mr. Lakhey, has contributed to hydropower projects with capacities ranging from 9.51 MW to 341 MW. His experience spans across planning, feasibility studies, detailed engineering design, 3D modelling, hydraulic modelling, BOQ and construction drawing preparation for various hydropower components, such as headworks and powerhouse.
Throughout his professional career, he engaged in detailed engineering design, preparation of construction drawings for the Mai Beni Hydroelectric Project (9.51 MW), Lungri Khola Hydropower Project (9.6 MW), Langtang Khola Hydroelectric Project (20 MW), Super Lower Bagmati Hydroelectric Project (41.86 MW), Bakan Hydroelectric Project (44MW), Khimti-II Hydropower Project (48.8 MW), Mewa Khola Hydropower Project (50 MW), Nilgiri Khola II Hydropower Project (71 MW), Middle Mewa Hydropower Project (73.5 MW). He has also been involved in Feasibility study for Apsuwa 1 and Upper Apsuwa Hydropower Project (23 and 35.15MW), Budhi Gandaki Hydroelectric Project (341 MW).