Carried out Feasibility Study of Run of River hydropower project of capacity 60MW located across Tamor River in Taplejung District.
Major Features:
Design Discharge 7.5 m3/sec, Gross head 968m, Plant Capacity 60MW
Run of the River headworks with diversion weir, side intake, gravel trap, approach culvert, 64m long settling basins, 3.8m dia inverted-D shaped 1954m and 4686m long two headrace tunnels, underground surge shaft of dia 5m and 37m height, 3m diameter three vertical shafts of 280, 238 and 242m height, 67m long pressure tunnel with pipe, surface powerhouse and tailrace culvert.

Project Details
- Category: Feasibility Study
- Client Name: Union Hydropower Ltd.
- Location: Dhobighat, Lalitpur, Nepal.
- Project Status: Feasibility Study Complete