• Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch
    • Home
    • Company
      • About Us
      • Message from the Chairman
      • Board of Directors
      • Our Team
      • Career
    • Our Services
    • Our Projects
    • News and Events
    • Get in touch
  • mail@htr.com.np
  • (+977) 1 4430066
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunnelling and Research Pvt. Ltd
  • Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch

Upper Tamor A Hydropower Project

Carried out Feasibility Study of Run of River hydropower project of capacity 60MW located across Tamor River in Taplejung District.

Major Features:

Design Discharge 7.5 m3/sec, Gross head 968m, Plant Capacity 60MW

Run of the River headworks with diversion weir, side intake, gravel trap, approach culvert, 64m long settling basins, 3.8m dia inverted-D shaped 1954m and 4686m long two headrace tunnels, underground surge shaft of dia 5m and 37m height, 3m diameter three vertical shafts of 280, 238 and 242m height, 67m long pressure tunnel with pipe, surface powerhouse and tailrace culvert.

Project Details

  • Category: Feasibility Study
  • Client Name: Union Hydropower Ltd.
  • Location: Dhobighat, Lalitpur, Nepal.
  • Project Status: Feasibility Study Complete

Project Gallery

Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunneling and research Pvt. Ltd is an engineering consultancy service company providing services mainly in Planning, Design and implementation of Hydropower and Tunnelling/Underground Projects.

Discover More

Contact Info

  • Kalikasthan, Kathmandu-29, Nepal
  • (+977) 1 4430066
  • hydrotunnelling@gmail.com
  • 09:00 am - 05:30 pm

Copyright © 2025, Hydro Tunnelling and Research Pvt. Ltd.
Powered by AspireWEB