Upper Bheri Hydroelectric Project
Has carried out Detailed Feasibility Study of Peaking Run of River hydropower project of capacity 325MW located across Thuli Bheri River in Dolpa District.
Major Features:
Design Discharge 89 m3/sec, Gross head 428m, Plant Capacity 325MW
Peaking Run of the River headworks with gravity concrete dam of height 48m, side intake, approach tunnels, 175m long 2 underground settling basins, 7.4m dia modified horseshoe shaped 15.8km long headrace tunnel, underground surge shaft of dia 15m and 102m height, 7m excavation diameter vertical shaft of 351m height, underground powerhouse cavern and transformer cavern, access tunnel.

Project Details
- Category: Feasibility Study
- Client Name: Integrated Mobility Solutions Pvt. Ltd.
- Location: Gyaneshwor, Kathmandu, Nepal.
- Project Status: Feasibility Study Complete