Carried out Updated Feasibility Study, Detailed Engineering Design and Advisory during construction of Run of River hydropower project of capacity 9.51MW located across Mai River in Ilam District. Project is complete.
Major features:
Design Discharge 8.4 m3/sec, Gross head 147.5m, Plant Capacity 9.51MW
Run of the river headworks with diversion boulder riprap weir, side intake, gravel trap, approach culvert, 45m long 2 settling basins, 2-2.1m dia 2km long headrace pipes, 2.8m dia inverted-D two headrace tunnels (1030m and 1344m long each), Inclined surface surge pipes, 317m long surface penstock pipe, surface powerhouse.
Status:
Complete, Plant has been running smoothly.

Project Details
- Category: Detailed Engineering Design
- Client Name: Samling Power Company Ltd
- Location: Sanepa, Lalitpur, Nepal.
- Project Status: Completed
- Project Year: #