Is carriying out Detailed Engineering Design and Support During Construction of Run of River hydropower project of capacity 20MW located across Langtang River in Rasuwa District. The Project is at construction phase.
Major features:
Design Discharge 12m3/sec, Gross head 205m, Plant Capacity 20MW
Run of the River headworks with diversion weir, side intakes, gravel trap, approach culvert, 70m long 2×2 settling basins, 3×3.3m dia inverted-D shaped 2900m long headrace tunnel, underground surge tunnel of dia 4m and 280m inclined length, 3m excavation diameter inclined shaft of 190m length, 236m long pressure tunnel with pipe, surface powerhouse and tailrace culvert.
Status:
DED nearly complete, Under Construction with nearly 90% complete

Project Details
- Category: Detailed Engineering Design
- Client Name: Multi Energy Development P. Ltd.
- Location: Baneshwor, Kathmandu, Nepal.
- Project Status: DED nearly complete
- Project Year: #