East West Railway Tunnel Project
Carried of Detailed Engineering Design of four tunnels along the alignment of Nijgadh-Hetauda-Bharatpur Section of Mechi-Mahakali Electrified Railway line. The proposed tunnel alignment of railway passes through the sedimentary rocks of the Siwalik Group, central Nepal, with total length of 4.53 km.
Consultant: YOOSHIN-BARSYL-CREEC-FBC JV

Project Details
- Category: Railway
- Client Name: Government of Nepal
- Department: Department of Railways
- Location: Nepal