• Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch
    • Home
    • Company
      • About Us
      • Message from the Chairman
      • Board of Directors
      • Our Team
      • Career
    • Our Services
    • Our Projects
    • News and Events
    • Get in touch
  • mail@htr.com.np
  • (+977) 1 4430066
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunnelling and Research Pvt. Ltd
  • Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch

East West Railway Tunnel Project

East West Railway Tunnel Project

Carried of Detailed Engineering Design of four tunnels along the alignment of Nijgadh-Hetauda-Bharatpur Section of Mechi-Mahakali Electrified Railway line. The proposed tunnel alignment of railway passes through the sedimentary rocks of the Siwalik Group, central Nepal, with total length of 4.53 km.

Consultant: YOOSHIN-BARSYL-CREEC-FBC JV

Project Details

  • Category: Railway
  • Client Name: Government of Nepal
  • Department: Department of Railways
  • Location: Nepal

Project Gallery

Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunneling and research Pvt. Ltd is an engineering consultancy service company providing services mainly in Planning, Design and implementation of Hydropower and Tunnelling/Underground Projects.

Discover More

Contact Info

  • Kalikasthan, Kathmandu-29, Nepal
  • (+977) 1 4430066
  • hydrotunnelling@gmail.com
  • 09:00 am - 05:30 pm

Copyright © 2025, Hydro Tunnelling and Research Pvt. Ltd.
Powered by AspireWEB