Budhi Gandaki Hydroelectric Project
Has carried out Updated Feasibility Study of Peaking Run of River hydropower project of capacity 341MW located across Budhi Gandaki River in Gorkha District.
Major Features:
Design Discharge 100 m3/sec, Gross head 398m, Plant Capacity 341MW
Peaking Run of the River headworks with gravity concrete dam of height 38m, side intake, gravel trap, approach tunnel, 150m long 3 underground settling basins, 6.5m dia modified horseshoe shaped 6842m long headrace tunnel, underground surge shaft of dia 22m and 60m height, 5m internal diameter vertical shaft of 324m height, 641m long pressure tunnel with pipe, underground powerhouse cavern and transformer cavern, access tunnel.

Project Details
- Category: Feasibility Study
- Client Name: Time Energy Pvt. Ltd.
- Location: Gyaneshwor, Kathmandu, Nepal.
- Project Status: Feasibility Study Complete