Bhotekoshi-1 Hydropower Project
HTR is carrying out Detailed Engineering Design of Run of River hydropower project of capacity 44MW located across Bhotekoshi River in Sindhupalchowk District.
Major features:
Design Discharge 49m3/sec, Gross head 116m, Plant Capacity 44MW
Run of the River headworks with diversion weir, side intakes, gravel trap, approach culvert, 146m long 2×3 settling basins, 5.4m dia inverted-D shaped 2675m long headrace tunnel, underground surge shaft of dia 12m and 51m height, 96m high vertical penstock shaft, 90m long 5.4m dia pressure tunnel, underground powerhouse to accommodate 2 vertical axis francis turbines, underground transformer cavern, 6m dia main access tunnel, and tailrace tunnel.
Status:
DED ongoing together with construction of the headworks and underground powerhouse and transformer caverns, headrace tunnel, vertical shaft, surge shaft and other structures

Project Details
- Category: Detailed Engineering Design
- Client Name: Electro Power Company Pvt Ltd.
- Location: Kathmandu, Nepal.
- Project Status: DED ongoing
- Project Year: #