Hydro Tunnelling and Research Pvt. Ltd. & Epicentre Engineering Solutions Pvt. Ltd. (HTR–EES JV) has signed a contract with Sangrila Urja Limited to carry out the Detailed Feasibility Study for the 171 MW Chhimdi–Kuwadi Khola Storage Hydroelectric Project.

Leave a Reply

Your email address will not be published. Required fields are marked *