• Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch
    • Home
    • Company
      • About Us
      • Message from the Chairman
      • Board of Directors
      • Our Team
      • Career
    • Our Services
    • Our Projects
    • News and Events
    • Get in touch
  • mail@htr.com.np
  • (+977) 1 4430066
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunnelling and Research Pvt. Ltd
  • Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch

Bagmati Small Hydropower Project (32MW)

Bagmati Small Hydropower Project (32MW)

Hydraulic design is carried out for the rehabilitation and addition of a new unit in the headworks components. Moreover, suitable recommendations are made for powerhouse protection works based on results obtained from the HEC-RAS model.

Major features:

Design Discharge 18.6m3/sec, Gross head 213m, Plant Capacity 32MW

The rehabilitation of headworks components includes the addition of gravel traps for trapping sediment particles of size 5mm or greater. A hopper-type gravel trap with a sediment flushing culvert is provided. The gravel trap outlet branches into the three approach culverts leading to hopper-type conventional settling basin bays. The new approach culvert takes 6 m3/s discharge to the added settling basin bay. A settling basin inlet gate is provided to control the flow into the new bay. The new settling basin bay is added on the hillside at the right bank of the Bagmati River. The new settling basin bay sits parallel to the old bays, and its flushing culvert passes over the headrace culvert and discharges into the river.

Project Details

  • Category: Special Technical Support
  • Client: Mandu Hydropower Limited
  • Location: Kathmandu, Nepal
  • Project Status: Completed

Project Gallery

Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunneling and research Pvt. Ltd is an engineering consultancy service company providing services mainly in Planning, Design and implementation of Hydropower and Tunnelling/Underground Projects.

Discover More

Contact Info

  • Kalikasthan, Kathmandu-29, Nepal
  • (+977) 1 4430066
  • hydrotunnelling@gmail.com
  • 09:00 am - 05:30 pm

News and Events

Hydro Tunnelling and Sagarmatha Hydropower Partner for Dudhkoshi-6 Hydropower Project Design April 3, 2026

Copyright © 2025, Hydro Tunnelling and Research Pvt. Ltd.
Powered by AspireWEB