• Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch
    • Home
    • Company
      • About Us
      • Message from the Chairman
      • Board of Directors
      • Our Team
      • Career
    • Our Services
    • Our Projects
    • News and Events
    • Get in touch
  • mail@htr.com.np
  • (+977) 1 4430066
Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunnelling and Research Pvt. Ltd
  • Home
  • Company
    • About Us
    • Message from the Chairman
    • Board of Directors
    • Our Team
    • Career
  • Our Services
  • Our Projects
  • News and Events
  • Get in touch

Upper Apsuwa and Apsuwa 1 Hydropower Projects

Upper Apsuwa and Apsuwa 1 Hydropower Projects

Carried out Feasibility Study of Run of River hydropower projects of capacity 35 and 25MW located across Apsuwa River in Sankhuwasabha District.

Project Details

  • Category: Feasibility Study
  • Client Name: Janaki Hydropower Pvt. Ltd.
  • Location: Kathmandu, Nepal.
  • Project Status: Feasibility Study complete

Project Gallery

Hydro Tunnelling and Research Pvt. Ltd
Hydro Tunneling and research Pvt. Ltd is an engineering consultancy service company providing services mainly in Planning, Design and implementation of Hydropower and Tunnelling/Underground Projects.

Discover More

Contact Info

  • Kalikasthan, Kathmandu-29, Nepal
  • (+977) 1 4430066
  • hydrotunnelling@gmail.com
  • 09:00 am - 05:30 pm

News and Events

Contract Signed for Detailed Engineering Design of Marsyangdi Nadi Peaking Run-of-River Hydropower Project (90 MW) August 14, 2026
Contract Signed for Detailed Feasibility Study of the 171 MW Chhimdi–Kuwadi Khola Storage Hydroelectric Project July 31, 2026

Copyright © 2025, Hydro Tunnelling and Research Pvt. Ltd.
Powered by AspireWEB